Contract - ATN 2634
Contract Details
THIS IS AN ADVANCE NOTICE ONLY - NO DOCUMENTS AVAILABLE - FULL DETAILS WILL BE RELEASED WITH THE TENDER
The tender will be released via eProcure, www.eprocure.com.au/gmwater/ . Please ensure you are registered on the eprocure platform and check for new tender releases regularly.
It is planned that this Tender will be released on approximately 29 October 2024
Goulburn-Murray Water (GMW) is seeking a suitable contractor for the installation of a new safe access system to the internal area of the penstock pit at the GMW Eppalock Depot. The system
will consist of stairways and platforms to provide safer access to the assets within the penstock pit.
The aim is to establish a sole supplier who can offer the below services (but not limited to):
- Review and verification of the IFC drawings (appendix C).
- Confirm site conditions allow for safe access and installation.
- Supply, fabrication, and installation of access system.
- Removal and disposal of the existing access system.
- Provide marked-up (redline) as-built drawings to GMW.
The form of contract will be a VPS Minor Works Contract.
| [email protected] | |
| Office: +61 1800 013357 |
Supplier Information
| 1 |
Fast Track Fabrication
|
