Display Tender CW-2022-23-CONT0020
If it's a selective tender, only the person that received the email notification and was invited to view the tender, can view and access it.
Use the forgot password feature, to access your account credentials at https://www.tenders.vic.gov.au/person/resetPassword
- Mrignaini Narswani
- Office: +61 (03) 94965000
- [email protected]
- Hao Truong
- Technical
- Phone: +61 (04) 68602634
- [email protected]
Description
Austin Health’s current general Sterile Store is located within the operating suites floor in level 2 of the Harold Stokes Building (HSB). In relocating the sterile store department, it will alleviate space on the floor level for the new Consolidated Endoscopy Centre. The operating theatre team currently utilises the level 2 Sterile Stores as their pick point for clinical use. With this relocation there will be a requirement to design and construct a new sterile storeroom within the level 2 operating theatre complex. The new Consolidated Endoscopy Centre will be built in the existing sterile store and forms part of the scope of work of this project. the project is required to be staged to enable the relocation of the sterile store to make way for the new endoscopy centre. The overall scope of work for this project entails the refurbishment of existing spaces on both Level 2 and 3 of HSB. In addition, a new plantroom is also required on Level 4 of HSB. Please refer to floor plans for details of the works on 3 floor levels of HSB. The construction includes but not limited to:
Contractors interested in tendering for the work is required to have extensive knowledge and experience with working within an operational tertiary health facility. The contractors is required to have had experience in working and managing specialised trades and equipment installation. This includes nominated hospital contractors. Interested tenderers also need to be registered with Austin Health iPro Certification in addition to DTF construction Supplier Registration List. Contractor must agree to sign the Austin construction contract unamended. |
-
AS010 (P1) L4 PLANT ROOM LOCALITY PLAN.pdf
- Version 1 (12 Apr 2023)
- Available by Download (721 KB)
-
A20 (P3) HSB LEVEL 03 STAGING PLAN PROPOSED - OVERALL.pdf
- Version 1 (12 Apr 2023)
- Available by Download (776 KB)
-
A10 (P6) HSB LEVEL 02 STAGING PLAN PROPOSED - OVERALL.pdf
- Version 1 (12 Apr 2023)
- Available by Download (742 KB)