Display Tender CN0496
If it's a selective tender, only the person that received the email notification and was invited to view the tender, can view and access it.
Use the forgot password feature, to access your account credentials at https://www.tenders.vic.gov.au/person/resetPassword
- Damien Murphy
- Technical
- Mobile: +61 (04) 09569119
- [email protected]
Description
CN0496 – SWEP WINTER 2023 CHANNEL LINING CONSTRUCTION
LMW is seeking to engage suitably qualified contractors for the construction/installation of channel lining and associated works for the LMW Sunraysia Water Efficiency Project.
Contract Specific Information
LMW is seeking to engage contractors for the installation of channel lining for the Winter Works 2023 (WW2023) Package. The works are to be delivered during irrigation channel shutdown periods in June & July 2023.
The works are to be constructed in accordance with the LMW design drawings and specifications, and comprise of:
- Lining of approx. 4km of existing channel (Principal supplied liner)
- Dewatering of channels
- Cleaning and patching of existing concrete channels
- Concrete rebuild of specific channel sections
- Construction of concrete ‘silt traps’ and concrete anchor blocks
- Fixing of liner material either by anchor trench or stainless steel batten strips
- Cut and welding of liner sections
- Installation of human and fauna channel escape ladders (Principal supplied)
- Installation of approx. 8km of stockproof fencing, including PA and vehicle gates
- Minor earthworks to restore channel banks
- Supply and operation of temporary pumping equipment where required to supply water to irrigators
- Supply and installation of a 210m long DN450 PVC pipeline
Location of the Works
The location of works is spread over two irrigation districts in far North-Western Victoria (Mildura and Red Cliffs).
-
CN0496 - RFT Part A - Conditions of Tendering.pdf
- Version 1 (31 Mar 2023)
- Available by Download (3 MB)
-
CN0496 - RFT Part B1 - General Specification.pdf
- Version 1 (31 Mar 2023)
- Available by Download (1 MB)
-
CN0496 - RFT Part B2 - Detailed Specification.pdf
- Version 1 (31 Mar 2023)
- Available by Download (1 MB)
-
CN0496 - RFT Part B2 - Appendices.zip
- Version 1 (31 Mar 2023)
- Available by Download (93 MB)
-
CN0496 - RFT Part B2 - Appendix 11 - Bill of Quantities.pdf
- Version 1 (18 Apr 2023)
- Available by Download (101 KB)
-
CN0496 - RFT Part C - Draft Contract.pdf
- Version 1 (31 Mar 2023)
- Available by Download (976 KB)
-
CN0496 - RFT Part D - Returnable Schedules.pdf
- Version 1 (31 Mar 2023)
- Available by Download (863 KB)
-
CN0496 - RFT Part D - Returnable Schedules.DOCX
- Version 1 (31 Mar 2023)
- Available by Download (365 KB)
-
CN0496 - RFT Part D - Appendix -Pricing Schedule.xlsx
- Version 1 (31 Mar 2023)
- Available by Download (72 KB)
-
CN0496 - RFT Part E - Dataroom.pdf
- Version 1 (31 Mar 2023)
- Available by Download (473 KB)
-
CN0496 - Addenda 1.pdf
- Version 1 (11 Apr 2023)
- Available by Download (146 KB)
-
CN0496 - Addenda 2.pdf
- Version 1 (18 Apr 2023)
- Available by Download (161 KB)
-
CN0496 - Contestable Outcome - SWEP Winter Construction 2023.pdf
- Version 1 (18 Apr 2023)
- Available by Download (149 KB)
-
CN0496 - 30049150_ENV_003_Ecology_Figure1_CEMP.pdf
- Version 1 (18 Apr 2023)
- Available by Download (4 MB)
-
CN0496 - 30049150_SWEP_WW23_CEMP_2023.04.05.pdf
- Version 1 (18 Apr 2023)
- Available by Download (4 MB)
-
CN0496 - Addenda 3.pdf
- Version 1 (24 Apr 2023)
- Available by Download (174 KB)