JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

Buying For Victoria
Skip to main content

Display Tender CN0479a 

If it's a selective tender, only the person that received the email notification and was invited to view the tender, can view and access it.

Use the forgot password feature, to access your account credentials at https://www.tenders.vic.gov.au/person/resetPassword

LMW CN0479a SWEP Channel Liner Materials
Issued By Lower Murray Water
Request for Tender
Status:
Closed
Number:
CN0479a
Contract Number
CN0479a
UNSPSC
Facility maintenance and repair services

Enquiries 

Description

This Industry Briefing is part of Recent Tender - CN0479 SWEP Channel Linings Project

SUNRAYSIA WATER EFFICIENCY PROJECT

CONSTRUCTION & MATERIAL SUPPLY BRIEFING SESSION

Organisation: Lower Murray Water

Issued by: Sunraysia Water Efficiency Project

Location: Mildura and Echuca: Victoria

Category: Industry Briefings

  • Construction
  • Materials Supply

Description:

Lower Murray Water is inviting companies to attend an industry briefing for the Sunraysia Water Efficiency Project (SWEP) scope of works.

The SWEP is a $37.9 million program of works which aims to create a more efficient water delivery network across the Mildura, Red Cliffs and Merbein Irrigation Districts.

The project involves the modernisation of around 26.7 km of irrigation channel through the installation of channel liners and the installation of buried pipelines. In addition, at least 279 Dethridge meters will be removed or upgraded, and at least 210 domestic and stock outlets will have modern flow meters installed.

The scope of works includes lining existing channels, replacing channels with pipeline, rationalising or replacing small meter outlets, and installing flowmeters on stock and domestic services.

Material supply includes irrigation small meter outlets (SMOs), Stock and Domestic meters (D&S) and plastic channel liner.

The project will be delivered by late 2024, with a majority of works needing to be completed during the lower irrigation demand periods in winter 2023 and winter 2024.

Upcoming construction and material supply packages will include:

 

  • Supply of Channel Lining Material - Balance
  • Supply of Pipeline Material
  • Domestic and Stock (D&S) Materials
  • Construction Contract to Undertake Channel Lining works as part of the WW2023 (Mildura and Red Cliffs)
  • Construction Contract to Undertake Channel Lining in-season (Merbein)
  • Construction Contract to undertake Channel Lining works as part of the WW2024 (Mildura L & K Channels)
  • Panel of subcontractors to undertake SMO and D&S works (Merbein, Mildura and Red Cliffs)

 

Industry Briefing Session

An industry briefing session will be held in both Mildura and Echuca to provide a high-level summary of upcoming procurement package requirements. This summary is provided for communication and planning purposes only.

 

It is not a solicitation and doesn’t constitute a request for proposal. It is also not a commitment by the Sunraysia Water Efficiency Project to purchase the described works or services.

We have no obligation to respond to or return any unsolicited bids received.

 

 

Session 1:  Mildura
Location:
Quality Hotel “Mildura Grand Hotel”
Room: Ballroom #2
129 - 137  Seventh St, Mildura VIC 3500
Date: Wednesday, 1 March 2023
Time: 4pm

 

Session 2:  Echuca
Location:
Mecure Port of Echuca
Room: River Room
465 High Street Echuca, Vic 3564
Date: Friday, 3 March 2023
Time: 4pm

 

 

 

 

 

SWEP Key Contact:
Ahmed Hammouri

SWEP Senior Project Manager
Lower Murray Water

[email protected]

Specification Documents 

You must be logged in to download documents.
  •    BFV - Notice Letter - SWEP Industry Briefing.pdf
    • Version 1 (13 Feb 2023)
    • Available by Download   (172 KB)