Display Tender BWCO-S1224-001632 

This page displays the details of a tender.

Lara West Sewer Pump Station
Issued By Barwon Water
Request for Tender
Status:
Open
Number:
BWCO-S1224-001632
Contract Number
BWCO-S1224-001632
UNSPSC
Water and wastewater treatment supply and disposal

Enquiries 

Other Contacts

Description 

Barwon Water is seeking to appoint a suitably qualified and experienced Principal Contractor to supply and install a new sewer pump station and emergency storages, including associated infrastructure, electrical works and landscaping in Lara, Victoria.

It is a condition of Tender that Tenderers attend a Compulsory Site Inspection commencing 9.00 AM on Wednesday 8th December 2021, held at 69 Reflections Cres, Lara, VIC (Parking on Windermere Rd, Lara). Details are in the Tender Document, Clause 3.2

Tender closes: Thursday 20th January 2022 at 14:00 Hours AEST (Local time in Victoria Australia).

Tender documents can be downloaded at https://www.buyingfor.vic.gov.au

Tenders to be lodged to the Barwon Water electronic tender box at https://www.buyingfor.vic.gov.au

Specification Documents 

You must be logged in to download documents.
  •    5.3.3 - Lara West SPS Hydrogeological Assessment
    • Version 1 (24/11/2021)
    • Available by Download   (11 MB)
  •    5.3.2 - Contamination Assessment
    • Version 1 (24/11/2021)
    • Available by Download   (3 MB)
  •    5.3.1 - Geotechnical Factual Report
    • Version 1 (24/11/2021)
    • Available by Download   (6 MB)
  •    5.2.1 - Lara West SPS Detailed Design Drawing Set - Tender Issue
    • Version 1 (24/11/2021)
    • Available by Download   (33 MB)
  •    5.1.11 - Fire Awareness Management Procedure
    • Version 1 (24/11/2021)
    • Available by Download   (1 MB)
  •    5.1.10 - Contract Stakeholder Engagement Requirements - S1224 - Lara West SPS
    • Version 1 (24/11/2021)
    • Available by Download   (729 KB)
  •    5.1.9 - As-Constructed Survey Data Requirements - Major Pipelines, Buildings and Facilities
    • Version 1 (24/11/2021)
    • Available by Download   (1 MB)
  •    5.1.8 - Contract Completion Requirements
    • Version 1 (24/11/2021)
    • Available by Download   (469 KB)
  •    5.1.7 - SQE Contract Requirements Appendix 7 - COVID19
    • Version 1 (24/11/2021)
    • Available by Download   (139 KB)
  •    5.1.6 - SQE Contract Requirements Appendix 6 - Lara West Cultural Heritage Management Plan 15047 18 Sep
    • Version 1 (24/11/2021)
    • Available by Download   (39 MB)
  •    5.1.5 - SQE Contract Requirements Appendix 5 - General Reinstatement Requirements
    • Version 1 (24/11/2021)
    • Available by Download   (135 KB)
  •    5.1.4 - SQE Contract Requirements Appendix 4 - Site Environmental Plan (SEP) Template
    • Version 1 (24/11/2021)
    • Available by Download   (1001 KB)
  •    5.1.3 - SQE Contract Requirements Appendix 1 - Contractor Monthly Project Report
    • Version 1 (24/11/2021)
    • Available by Download   (277 KB)
  •    5.1.2 - SQE Contract Requirements - S1224 - Lara West SPS
    • Version 1 (24/11/2021)
    • Available by Download   (3 MB)
  •    5.1.1 - Lara West SPS Technical Specification - Tender Issue
    • Version 1 (24/11/2021)
    • Available by Download   (3 MB)
  •    03 Pricing Reference and Rates Reference Schedule - S1224 - Lara West SPS
    • Version 1 (24/11/2021)
    • Available by Download   (35 KB)
  •    02 Annexure B_ Barwon Water - AS4902 - Design and Construct - Final - V10
    • Version 1 (24/11/2021)
    • Available by Download   (916 KB)
  •    01 Annexure A_ Scope of Work - S1224 - Lara West SPS
    • Version 1 (24/11/2021)
    • Available by Download   (1 MB)
  •    00 Tender Instruction Document - S1224 - Lara West SPS
    • Version 1 (24/11/2021)
    • Available by Download   (1 MB)
  •    Addendum 1 to Tender 001632 - Contestability Assessment Letter
    • Version 1 (29/11/2021)
    • Available by Download   (111 KB)
  •    Contestable Outcome - Lara West Sewer Pump Station
    • Version 1 (29/11/2021)
    • Available by Download   (144 KB)

Responses 

You must be logged in to submit a response.
Tender closes at 20 January 2022 02:00 PM
Click here to submit an electronic response