Display Tender 1245B
This page displays the details of a tender.
Contacts
- Richard Fincher
- Office: +61 (03) 5150 4462
- Mobile: +61 0429 931 410
- RFincher@egwater.vic.gov.au
Description
East Gippsland Water (EGW) will release a Request for Tender on TenderLink in October 2021 for the installation and commissioning of a new transfer pump (pump 2) at the Lakes Entrance Wastewater Treatment Plant. The new pump is to replace the remaining Weir Duoglide centrifugal pump which is not operating and has reached the end of its design life. The system is currently operating on the single Godwin pump (pump 1) with no redundancy. Works will include equipment removal, structural and pipework modifications and an upgrade to electrical instrumentation and control equipment.
The shortlisting and interview process will take place late in 2021 with final award anticipated to be January 2022.
This forward notice is issued by East Gippsland Water (the Principal). This is not a release of the RFT documents.
Providers are to note this breakdown may vary at the time of the release and are to use this as a guide only. This RFT will be released via www.tenderlink/egwater. All activities in relation to this RFT, including Q&A and tender lodgement, will be managed via www.tenderlink/egwater.
Organisations wishing to participate in this process are to register at www.tenderlink/egwater.
Do not lodge questions or responses at Tenders VIC or Buying for Victoria.
-
1245B Lakes Entrance Wastewater Treatment Plant Transfer Pump Replacement - Tendering Forward Notice
- Version 1 (22 Oct 2021)
- Available by Download (44 KB)