Description
Barwon Water is seeking to appoint a suitably qualified and experienced Principal Contractor for the supply and construction of approximately 5km (Sections 19,20,21 & 25i (Stage 1) and 23 (Stage 2)) of the Colac Pipeline Upgrade and all associated works. The majority of these works occur in the Great Otway National Park, with some works in the Otway State Forest and Colac Otway Shire road reserve. Minimisation of environmental impact and vegetation removal is critical to this project throughout construction. To aid this, works are to be contained within a constrained corridor with extensive use of no-go zones for protection. All construction is to be via open-cut and fill with trench widths to be minimised while still meeting the appropriate standards. Battering/benching will only be acceptable in areas where there is no impact to vegetation or incursion into Tree Protection Zones. There are Cultural Heritage aspects associated with this project, with details outlined in the Cultural Heritage Management Plan.
The proposed staging of this project sees Stage 1 (Sections 19,20,21&25i) constructed in the 2021/22 financial year, with Stage 2 (Section 23) to occur in the 2022/23 financial year. Due the climatic nature of the Otways, it is expected construction activities will occur during the drier months of the year.
It is a condition of Tender that Tenderers attend a Compulsory Site Inspection commencing 10.00 AM on 30 September 2021, held at the corner of Colac Pipeline track and Barongarook Rd, Barongarook. Due to the nature of the project site and COVID-19 risk management, each tenderer will be limited to one representative. To further reduce risk through minimising exposure, product suppliers will not be invited to attend. As always, suppliers can be provided the list of tenderers who attended the site visit upon request to enable them to make contact to tenderers directly to offer their product support. Further details are in the Tender Document, Clause 3.2
Tender closes: 03 November 2021 at 14:00 Hours AEST (Local time in Victoria Australia).
Tender documents can be downloaded at https://www.buyingfor.vic.gov.au
Tenders to be lodged to the Barwon Water electronic tender box at https://www.buyingfor.vic.gov.au
Enquiries should be made to:
Daniel Priddle via email: [email protected]
-
Addendum to Tender - No. 001 - Tender No. BWCO-W1426-001605
- Version 1 (22 Sept 2021)
- Available by Download (11 KB)
-
Contestable Outcome - Construction of Colac Pipeline Upgrade Sections 19,20,21, 23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (146 KB)
-
00 - Tender Instruction Document - BWCO-W1426-001605 - Colac Pipeline Upgrade Sections 19,20,21, 23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (1 MB)
-
00 -Tender Instruction Document - BWCO-W1426-001605 - Colac Pipeline Upgrade Sections 19,20,21, 23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (2 MB)
-
01 - Tender Document - 01 Scope of Work - BWCO-W1426-001605 - Colac Pipeline Upgrade Sections 19,20,21, 23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (1 MB)
-
02 - DRAFT Contract - AS4902 - BWCO-W1426-001605 - Colac Pipeline Upgrade Sections 19,20,21, 23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (6 MB)
-
5.1.01 - Technical Specification - BWCO-W1426-001605 - Colac Pipeline Upgrade Sections 19,20,21,23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (665 KB)
-
5.1.02 - SQE Contract Requirements - BWCO-W1426-001605 - Colac Pipeline Upgrade Sections 19,20,21, 23 and 25(i)
- Version 1 (22 Sept 2021)
- Available by Download (3 MB)
-
5.1.03 - SQE Contract Requirements Appendix 4 - Site Environmental Plan (SEP) Template PDF
- Version 1 (22 Sept 2021)
- Available by Download (1001 KB)
-
5.1.04 - SQE Contract Requirements Appendix 5 - General Reinstatement Requirements PDF
- Version 1 (22 Sept 2021)
- Available by Download (135 KB)
-
5.1.06 - SQECR Appendix 6 - Cultural Heritage Management Plan
- Version 1 (22 Sept 2021)
- Available by Download (25 MB)
-
5.1.08 - SQECR Appendix 6 - Detailed Flora and Fauna report
- Version 1 (22 Sept 2021)
- Available by Download (54 MB)
-
5.1.09 - SQECR Appendix 6 - Detailed Flora and Fauna Report - Construction Corridor and No-go zone mapping
- Version 1 (22 Sept 2021)
- Available by Download (7 MB)
-
5.1.11 - SQE Contract Requirments Appendix 7 - COVID19
- Version 1 (22 Sept 2021)
- Available by Download (139 KB)
-
5.1.12 - Contract Completion Requirements
- Version 1 (22 Sept 2021)
- Available by Download (469 KB)
-
5.1.13 - As-Constructed Survey Data Requirements - Major Pipelines, Buildings & Facilities
- Version 1 (22 Sept 2021)
- Available by Download (1 MB)
-
5.1.14 - Contract Stakeholder Engagement Requirements - W1426 - Colac Pipeline Upgrade Sections 19 20 21 23 & 25i
- Version 1 (22 Sept 2021)
- Available by Download (388 KB)
-
5.1.15 - Barwon Water Fire Awareness Management Plan
- Version 1 (22 Sept 2021)
- Available by Download (1 MB)
-
5.2.01 - Drawing Set - W1426 Colac Pipeline Upgrade - 01 - General Drawings (IFT)
- Version 1 (22 Sept 2021)
- Available by Download (5 MB)
-
5.2.01 - Drawing Set - W1426 Colac Pipeline Upgrade - 02 - SECTION 19 20 21 (IFT)
- Version 1 (22 Sept 2021)
- Available by Download (6 MB)
-
5.2.01 - Drawing Set - W1426 Colac Pipeline Upgrade - 03 - SECTION 23 (IFT)
- Version 1 (22 Sept 2021)
- Available by Download (8 MB)
-
5.2.01 - Drawing Set - W1426 Colac Pipeline Upgrade - 04 - SECTION 25i (IFT)
- Version 1 (22 Sept 2021)
- Available by Download (5 MB)
-
5.2.01 - Drawing Set - W1426 Colac Pipeline Upgrade - 05 - Combined Standard Drawings (IFT)
- Version 1 (22 Sept 2021)
- Available by Download (9 MB)
-
5.3.01 - Geotechnical Factual Report - W1426 Colac Pipeline Upgrade Sections 19 20 21 23 & 25i
- Version 1 (22 Sept 2021)
- Available by Download (5 MB)
-
5.3.02 - Contractor Monthly Project Report - W1426 - Colac Pipeline Upgrade Sections 19 20 21 23 & 25i - Contractor Name
- Version 1 (22 Sept 2021)
- Available by Download (277 KB)
-
5.3.03 - VIPP Monitoring Table
- Version 1 (22 Sept 2021)
- Available by Download (36 KB)
-
5.3.04 - VIPP Stat Dec Template
- Version 1 (22 Sept 2021)
- Available by Download (17 KB)
-
5.3.05 - New Asset FMMS Data & Capitalisation Sheet - W1426
- Version 1 (22 Sept 2021)
- Available by Download (373 KB)
-
5.3.06 - Workplace Risk Assessment (WRA) - W1426 Colac Pipeline Upgrade Sections 19 20 23 & 25(i) - Contractor Issue
- Version 1 (22 Sept 2021)
- Available by Download (463 KB)
-
Addendum to Tender - No. 002 - Tender No. BWCO-W1426-001605 - Site Visit
- Version 1 (22 Sept 2021)
- Available by Download (12 KB)
-
Addendum to Tender - No. 003 - Tender No. BWCO-W1426-001605 - Updated details of site visit
- Version 1 (28 Sept 2021)
- Available by Download (132 KB)
-
Addendum No. 004 - Tender No. BWCO-W1426-001605 - Updated Pricing and Rates Reference Schedule Rev_1
- Version 1 (8 Oct 2021)
- Available by Download (11 KB)
-
Addendum to Tender - No. 005 - Tender No. BWCO-W1426-001605 site visit clarifications and EOT
- Version 1 (14 Oct 2021)
- Available by Download (212 KB)
-
03 - Pricing and Rates Reference Schedule - BWCO-W1426-001605 REV_2
- Version 1 (14 Oct 2021)
- Available by Download (38 KB)
-
Addendum to Tender - No. 006 - Tender No. BWCO-W1426-001605 - Power outage EOT
- Version 1 (29 Oct 2021)
- Available by Download (12 KB)
-
Addendum to Tender - No. 007 - Tender No. BWCO-W1426-001605 - Power outage EOT further update
- Version 1 (29 Oct 2021)
- Available by Download (12 KB)