JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

Buying For Victoria
Skip to main content

Display Tender 2021/024 

This page displays the details of a tender.

San Remo Basin Renewal Project Design and Construction
Issued By Westernport Water
Request for Tender
Status:
Awarded
Number:
2021/024
UNSPSC
Water and wastewater treatment supply and disposal - (50%)
Specialized trade construction and maintenance services - (50%)

Enquiries 

Contacts

Description 

Westernport Region Water Corporation (Principal) provides water, wastewater and other service to some 20,000 properties on Phillip Island and an area of the mainland from The Gurdies through to Archies Creek.

The Principal is seeking tenders from suitable qualified and experienced contractors for the provision of the design, supply and construction of the following items of the San Remo Basin Renewal Project;

i. Detailed Design
ii. Temporary works required to continue the uninterrupted water supply for the duration of the shutdown of the Basin
iii. Replacing the existing liner and cover
iv. External earthworks required to remediate the Basin's batters
v. Modification to the existing outlet pipeworks
vi. Access track improvements

Tender documents and details regarding submission are provided via Tenderlink ID WRWC-964201. https://portal.tenderlink.com/westernportwater/tenderdetails/2659.688243/?checksum=2372447779127    

Mandatory site inspection at San Remo Bin Site s required and will be held on:
22nd April 10am and
23rd April 10am.

Tenderers are required to attend only one of the days and must confirm attendance via the Tender Forum at least 3 days prior.

Attendees must also complete the highlighted sections of the WPW access form attached along with the tend (Attachment A.1) for each person and email to Harsha Puvvala within 1-3 days before the site visit that you choose to attend.
 

Specification Documents 

You must be logged in to download documents.
  •    1. San Remo Basin Renewal Project - D&C Tender Part 1&2
    • Version 1 (19/04/2021)
    • Available by Download   (3 MB)
  •    2. San Remo Basin Renewal Project - D&C Tender Part 3
    • Version 1 (19/04/2021)
    • Available by Download   (1 MB)
  •    3. San Remo Basin Renewal Project - D&C Tender VPS -Conditions of Contract Feb 2021
    • Version 1 (19/04/2021)
    • Available by Download   (2 MB)
  •    4. San Remo Basin Renewal Project - D&C Contract Brief
    • Version 1 (19/04/2021)
    • Available by Download   (2 MB)
  •    5. Attachment A1. COVID WPW Site Access Request Form
    • Version 1 (19/04/2021)
    • Available by Download   (17 KB)
  •    6. Attachment A2. San Remo Basin Renewal Project - Contestability Assessment Letter
    • Version 1 (19/04/2021)
    • Available by Download   (141 KB)
  •    7. Part F - San Remo Basin Renewal Technical Specification
    • Version 1 (19/04/2021)
    • Available by Download   (1 MB)
  •    8. Part F - San Remo Basin Renewal Functional Design Drawings
    • Version 1 (19/04/2021)
    • Available by Download   (2 MB)
  •    9. Part F - San Remo Basin - Survey Drawings
    • Version 1 (19/04/2021)
    • Available by Download   (1 MB)
  •    10. Part F- Temporary Works drawing WPW-210302-C01_20210406_3
    • Version 1 (19/04/2021)
    • Available by Download   (517 KB)
  •    11. Part F - WPW Standard Specification For Concrete Supply
    • Version 1 (19/04/2021)
    • Available by Download   (155 KB)
  •    12. Part F - WPW Standard Specification For General Concrete Works
    • Version 1 (19/04/2021)
    • Available by Download   (251 KB)
  •    13. Part F - WPW Standard Specification for Water Pipe Lines
    • Version 1 (19/04/2021)
    • Available by Download   (423 KB)
  •    14. Part F- Operation & Maintenance Manual of Existing Basin
    • Version 1 (19/04/2021)
    • Available by Download   (2 MB)
  •    15.SAN REMO SERVICE BASIN LINER FLOATING COVER SRB
    • Version 1 (19/04/2021)
    • Available by Download   (171 KB)
  •    16.SAN REMO SERVICE BASIN LINER UNDERDRAIN DETAIL sht 4 of 4 Aust As Built
    • Version 1 (19/04/2021)
    • Available by Download   (137 KB)

Results 

This Tender was awarded. Click here to view the Contract.