Display Tender ITS2-00225. 

This page displays the details of a tender.

ITS2-00225 Lower Yarra River Maintenance Dredging Program Tender
Issued By Parks Victoria
Request for Tender
Status:
Awarded
Number:
ITS2-00225.
Contract Number
ITS2-00225
UNSPSC
Subsea dredging trenching and excavation services - (50%)
Dredging service - (50%)

Enquiries 

Contacts

Description 

The Principal invites the Tenderer to submit a Tender for the delivery of dredging services under the Lower Yarra River Maintenance Dredging Program including at sites centred around fixed and floating landings, wharfs, floating pontoons, and the main navigational channel. 

The Services are for two (2) fixed dredging campaigns – the Campaign A Services and the Campaign B Services which each have fixed commencement and completion dates.  The Principal has the sole discretion to award further tranches of the Services, namely the Campaign C Services and Further Services. The Sites relevant to the Campaign C Services and Further Services have not yet been determined and amongst other things will be subject to priorities at the time, the rate of siltation of previous Sites and budget availability.  If directed, the Campaign C Services and Further Services will also have fixed commencement and completion dates.

Parks Victoria is seeking responses from experienced operators who can provide dredging expertise that results in efficiencies, innovation and cost benefits over the course of the Contract.

Parks Victoria is the waterway manager for the Yarra River (under the Marine Safety Act 2010 (Vic)) and is responsible for ensuring safe navigation. Parks Victoria manages several fixed and floating landings as well as the navigational channel of the lower Yarra River. The gradual accretion of silt and sediment has led to a reduction in channel width and depth for some parts of the river resulting in restricted safe navigational access to facilities.

The Victorian Government has provided funding to improve commercial and recreational access along the Lower Yarra River through dredging.  This represents the biggest investment into the Yarra River since the 2006 Commonwealth Games. The funding boost means that the precinct will be maintained as a prominent landmark in Melbourne CBD and acknowledges its contribution to the modern culture and social vibrancy of Melbourne.

The aim of the Lower Yarra River Maintenance Dredging Program is to reinstate sufficient water depth at prioritised areas in a manner that minimises disturbance to stakeholders, is consistent with Government guidance and policy and is conducted in a safe and environmentally sustainable manner. 

Dredging sites are centred around fixed and floating landings as well as the navigational channel.  The Services will entail dredging at an estimated 4-6 dredging sites per year. As a general indication, each dredge campaign will be undertaken over an estimated period of 4-9 months, removing around an estimated volume of 8 000m3 per dredge campaign.  The required pumping distance for disposal ranges between 300-3,500m depending on the dredging site. The project area for the Lower Yarra River Maintenance Dredging Program extends between the Bolte Bridge and Burnley Harbour.

The nature of the Services and project constraints suggest the program is suited to small dredging equipment such as a small cutter suction dredger (CSD) or equivalent due to the restricted accessibility to the Sites given low bridge height clearance and the small dredging areas and volumes per dredging site. The dredged material is to be deposited in designated disposal sites in deeper parts of the river.

The environmental requirements for dredging must comply with:

  • the Addendum C - Lower Yarra Maintenance Dredging: Environmental Management and Monitoring Plan (EMMP) developed for the maintenance dredging program;
  • the Best Practice Environmental Management:  Guidelines for Dredging (BPEMG) (EPA 2001); and
  • the National Assessment Guidelines for Dredging (NAGD) (Commonwealth of Australia 2009).

The dredging services under the Lower Yarra River Maintenance Dredging Program will be carried out in accordance to Addendum A - Services Specification, Addendum B - Lower Yarra Maintenance Dredging Design – Specification and Addendum C - Lower Yarra Maintenance Dredging: EMMP. 

Close date for all questions is COB 28 April 2021.

Specification Documents 

You must be logged in to download documents.
  •    Addendum A - Services Specification (9 Mar 2021)
    • Version 1 (16/03/2021)
    • Available by Download   (3 MB)
  •    Addendum B - Lower Yarra Maintenance Dredging Design Specifications (25 Feb 2021)
    • Version 1 (16/03/2021)
    • Available by Download   (58 MB)
  •    Addendum C - Lower Yarra Maintenance Dredging EMMP (15 Mar 2021)
    • Version 1 (16/03/2021)
    • Available by Download   (11 MB)
  •    Addendum D - Yarra River Dredging Services Agreement (26 Feb 2021)
    • Version 1 (16/03/2021)
    • Available by Download   (912 KB)
  •    Addendum E - Pricing Template
    • Version 1 (16/03/2021)
    • Available by Download   (116 KB)
  •    Addendum F - Non Conforming Alternative Tender
    • Version 1 (16/03/2021)
    • Available by Download   (444 KB)
  •    Addendum G - HSE Management Questionnaire
    • Version 1 (16/03/2021)
    • Available by Download   (97 KB)
  •    Addendum H - IR Self-Assessment Checklist & Declaration
    • Version 1 (16/03/2021)
    • Available by Download   (41 KB)
  •    PV - Request for Tender (Public Construction) Locked (12 Mar 2021)
    • Version 1 (16/03/2021)
    • Available by Download   (1011 KB)
  •    ITS2-00225 Industry Briefing Attendee Package
    • Version 1 (30/03/2021)
    • Available by Download   (163 KB)
  •    Addendum I (Post Release)
    • Version 1 (08/04/2021)
    • Available by Download   (172 KB)
  •    ITS2-00225 Industry Briefing PowerPoint Slides 31 March 2021
    • Version 1 (08/04/2021)
    • Available by Download   (5 MB)
  •    ITS2-00225 Industry Briefing Meeting Recording 31 March 2021
    • Version 1 (08/04/2021)
    • Available by Download   (241 MB)
  •    Question & Answer Bulletin 1
    • Version 1 (08/04/2021)
    • Available by Download   (187 KB)
  •    Question & Answer Bulletin 2
    • Version 1 (15/04/2021)
    • Available by Download   (147 KB)

Results 

This Tender was awarded. Click here to view the Contract.