JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

Buying For Victoria
Skip to main content

Display Tender POH-RFT-2020-01 

This page displays the details of a tender.

Berth 1 Upgrade - Crib Point Jetty
Issued By Port of Hastings Development Authority
Request for Tender
Status:
Closed
Number:
POH-RFT-2020-01
UNSPSC
Structures and Building and Construction and Manufacturing Components and Supplies

Enquiries 

Contacts

Description 

Construction of a new berthing dolphin and walkways at Berth 1, Crib Point Jetty for the berthing and mooring of 120,000DWT tankers.

Due to COVID 19 logistics issues with travel within Australia being restricted, it has been requested that the tender date is extended to Wed 20th Jan. This request has been accepted.

Bidders will need to complete a Local Industry Development Plan (LIDP) for the tender using the tender name or number:  Crib Point Berth No.1 upgrade / PoHDA01

Please refer VMC portal:  https://icnvic.force.com  

For assistance, bidders can contact ICN Client Services via the VMC portal, or on 03 9864 6700 (option 2) 

or info@icnvic.org.au. If Industry Advisor assistance is required, bidders should allow 2-3 business days for this process.

A VMC User Guide for Suppliers is also available (refer Specification Documents). 

16/12/2020 Note: Additional information attached as requested by a tenderer.

 

 

 

Specification Documents 

You must be logged in to download documents.
  • Berth 1 Upgrade BoQ - IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (36 KB)
  • Berth 1 Upgrade CPJ Part A Conditions of Tendering IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (818 KB)
  • Berth 1 Upgrade CPJ Part B - Specifications IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (990 KB)
  • Berth 1 Upgrade CPJ Part B- Appendix A Drawing Set IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (10 MB)
  • Berth 1 Upgrade CPJ Part B Appendix B Construction Spec IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (27 MB)
  • Berth 1 Upgrade CPJ Part C -Conditions of Contract IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (4 MB)
  • Berth 1 Upgrade CPJ Part D - Tender Response Schedules IFT   
    • Version 1 (13/11/2020)
    • Available by Download   (375 KB)
  • IS303000-GE-MM-0001-Rev2_Crib Point Berthing Dolphin Geotechnical Design_20201120   
    • Version 1 (27/11/2020)
    • Available by Download   (2 MB)
  • VMC User Guide for Suppliers   
    • Version 1 (02/12/2020)
    • Available by Download   (1 MB)
  • AS James Geotech CPJ Berth 1 Northern dolphin   
    • Version 1 (16/12/2020)
    • Available by Download   (955 KB)

Forum 

Forum posts cannot be posted after 7 January 2021 06:00 PM

The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 7 January 2021 06:00 PM.

  Link To Forum

Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.