Display Tender VMFRP - CN0015 

If it's a selective tender, only the person that received the email notification and was invited to view the tender, can view and access it.

Use the forgot password feature, to access your account credentials at https://www.tenders.vic.gov.au/person/resetPassword

Victorian Murray Floodplain Restoration Project (VMFRP) Environmental and Planning Approvals Panel
Issued By Lower Murray Water
Request for Tender
Status:
Awarded
Number:
VMFRP - CN0015
Contract Number
CN0015
UNSPSC
Environmental impact assessment - (75%)
Environmental planning - (25%)

Enquiries 

Contacts

Description

Lower Murray Water (LMW) is seeking to appoint Suppliers under a Deed of Standing Offer to provide environmental and planning approvals services for the Victorian Murray Floodplain Restoration Project 
(‘VMFRP’). 

The Victorian Murray Floodplain Restoration Project is a $320m program of infrastructure works to improve the environmental watering of high valued floodplains on the Murray River in Victoria.  

The nine projects will involve works in areas of high environmental, heritage and community value. The projects will require environmental and planning approval prior to works commencing. 

All nine projects have been individually referred under both the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) and the Victorian Environment Effects Act 1978 (EE Act).

Considering the characteristics of the projects, the Ministerial determinations received to date and advice received from the regulators, it is highly likely that all projects will be required to undertake an impact assessment. Under the EPBC Act, all nine projects are likely to be considered a controlled action. Under the EE Act, all nine projects are likely to either require an EES or no EES with conditions (such as the preparation of an Environment Report, a Flora and Fauna Management Plan, an Environmental Management Framework and Construction Environmental Management Plan).

Suppliers must have the capacity and capability to prepare all studies, assessments, reports, permits and secondary consents as required to allow the projects to proceed to construction.

LMW is looking to engage with multiple Suppliers. Once appointed, successful Suppliers will be requested by LMW to provide a proposal for packages of work.

The packaging of work will be determined by LMW. These packages may comprise one or several of the project sites.

Update: 14 September 2020

Optional Briefing Session
A copy of the presentation along with a recording of the briefing session held online on 9 September 2020 02:00 PM have been added to this tender - refer to specification documents and ink below:

https://web.microsoftstream.com/video/dc8fc6de-7681-4c16-9836-4ff447d89f2c

 

Forum

Forum posts cannot be posted after 25 September 2020 05:30 pm

The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 25 September 2020 05:30 pm.

  Link To Forum

Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.

Results

This Tender was awarded. Click here to view the Contract.