Display Tender CN000095 

This page displays the details of a tender.

Melton RWP Additional Winter Storage
Issued By Western Water
Request for Tender
Status:
Awarded
Number:
CN000095
Contract Number
CN000095
UNSPSC
Water and sewer utilities - (34%)
Pipeline - (33%)
Earthworks engineering - (33%)

Enquiries 

Other Contacts

Description 

Construction of Additional Winter Storage at Melton Recycled Water Plant

Western Water is seeking tenders for construction of an additional onsite recycled water storage and associated interconnecting MSCL pipework within its Melton Recycled Water Plant.

The construction of a 1.1GL (1,100,000 m3) earthern Winter Storage dam at the Melton RWP, includes the supply of all required construction materials. The dam has the following approximate dimensions:

  • 700 m in length, 300 m in width, 9 m in height (approx. 4 m below natural surface, 5 m above natural surface)
  • Excavation of approx. 535,000 m3 of clay
  • Construction of approx. 280,000 m3 of embankments

Two (2) alternative construction options for the lining of the Winter Storage are acceptable and have been specified in the Part B2 – Technical Specification:

  • Option 1: Clay Liner with Rip-Rap erosion protection; or
  • Option 2: HDPE Liner

Western Water are open to constructing either lining option. Tenderers may submit an offer for either or both lining options for assessment.

In addition to the new Winter Storage dam, the contractor will be required to supply and install the interconnecting pipework (approx, 440m of MSCL pipework (up to 900mm diameter))) between the existing Winter Storage and the new Winter Storage. This scope of works is not optional and pricing must be provided in conjunction with either one or both of the storage dam lining options listed above.

Western Water is currently preparing the construction area to provide the appointed contractor with best possible access to the work area, some minor enabling works by the contractor will also be required as detailed in the Part B1 – Preliminary Specification.

A tender briefing/site visit will be held for Tenderers, the details of timing and location is provided in Part A -  Conditions of Tendering.

Tenderers will be required to submit an outline stakeholder engagement plan with their tenders and the appointed contractor will be required to finalise this document in consultation with Western Water operators and the farm leaseholder following contract award as part of its works management plans.

Tenderers will also be required to complete an online LIDP in accordance with the revised ICN process.  The project will be available through the recently upgraded ICN website at https://icnvic.force.com/s/login/ .

Tenderers should note that the previous ICN website will not access this project and tenderers should ensure they have access to the new site.  Failure to achieve successful ICN acknowledgement of an LIDP within the required timeframe (prior to tender close) will likely result in the tender being unable to be considered.

Questions during the tender period (until end of Period for questions) are to be directed via the Buying for Victoria website only.

Specification Documents 

You must be logged in to download documents.
  • CN000095 RFT Part B1_5 Winter Storage Geotechnical Report   
    • Version 1 (10/03/2020)
    • Available by Download   (11 MB)
  • CN000095 RFT Part B1_3 Contract OHS KPIs Final Rev1.0   
    • Version 1 (10/03/2020)
    • Available by Download   (70 KB)
  • CN000095 RFT Part B1_1 Guidance Site OHS Plans Final Rev1.0   
    • Version 1 (10/03/2020)
    • Available by Download   (105 KB)
  • CN000095 RFT Part B1_2 Health and Safety Risk Assessments Final Rev1.0   
    • Version 1 (10/03/2020)
    • Available by Download   (129 KB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt C - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (5 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt A - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (5 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt B - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (2 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt F - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (4 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt D - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (5 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt E - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (2 MB)
  • CN000095 RFT PArt B1_6A M2BM Early PipeWork Drawings - For Information Only   
    • Version 1 (10/03/2020)
    • Available by Download   (9 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt G - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (7 MB)
  • CN000095 RFT Part B1_4 CHMP 15660 - FILE Pt H - Approved (low res)   
    • Version 1 (10/03/2020)
    • Available by Download   (7 MB)
  • CN000095 RFT Part B1_6B Interconnecting Pipework - Modes of Operation - For Information Only   
    • Version 1 (10/03/2020)
    • Available by Download   (2 MB)
  • CN000095 RFT Part B1_8B RFI from Council   
    • Version 1 (10/03/2020)
    • Available by Download   (327 KB)
  • CN000095 RFT Part B1_8C Response to RFI   
    • Version 1 (10/03/2020)
    • Available by Download   (4 MB)
  • CN000095 RFT Part B1_7A EPA Works Exemption Request   
    • Version 1 (10/03/2020)
    • Available by Download   (1 MB)
  • CN000095 RFT Part B1_7B EPA Signed Works Exemption   
    • Version 1 (10/03/2020)
    • Available by Download   (197 KB)
  • CN000095 RFT Part B1_8A Planning Permit Application   
    • Version 1 (10/03/2020)
    • Available by Download   (7 MB)
  • CN000095 RFT Part B2 Technical Specification Front Page   
    • Version 1 (10/03/2020)
    • Available by Download   (76 KB)
  • CN000095 RFT Part B1_8D Offset Allocation Statement   
    • Version 1 (10/03/2020)
    • Available by Download   (16 KB)
  • CN000095 RFT Part B1_8E Draft Permit Conditions   
    • Version 1 (10/03/2020)
    • Available by Download   (158 KB)
  • CN000095 RFT Part B2_4 IFT DRG Melton WSP2 HDPE Lined Option   
    • Version 1 (10/03/2020)
    • Available by Download   (23 MB)
  • CN000095 RFT Part B2_1 Melton WSP2 Technical Specification Clay Liner   
    • Version 1 (10/03/2020)
    • Available by Download   (1 MB)
  • CN000095 RFT Part B2_2 IFT DRG Melton WSP2 Clay Lined Option   
    • Version 1 (10/03/2020)
    • Available by Download   (11 MB)
  • CN000095 RFT Part B2_6 IFT DRG Melton WSP2 Pipeline   
    • Version 1 (10/03/2020)
    • Available by Download   (7 MB)
  • CN000095 RFT Part C Proposed Contract AS2124 FINAL   
    • Version 1 (10/03/2020)
    • Available by Download   (500 KB)
  • CN000095 RFT Part B2_5 Melton WSP2 Technical Specification Pipeline   
    • Version 1 (10/03/2020)
    • Available by Download   (14 MB)
  • CN000095 RFT Part B1 Preliminaries Specification FINAL   
    • Version 1 (11/03/2020)
    • Available by Download   (551 KB)
  • CN000095 RFT Part B2_3 Melton WSP2 Technical Specification HDPE Liner   
    • Version 1 (11/03/2020)
    • Available by Download   (2 MB)
  • CN000095 RFT Part A Conditions of Tendering FINAL   
    • Version 1 (11/03/2020)
    • Available by Download   (187 KB)
  • CN000095 RFT Part D Tenderers Response FINAL Rev3 (20200316)   
    • Version 1 (16/03/2020)
    • Available by Download   (590 KB)
  • CN000095 RFT Part D Tenderers Response FINAL Rev3   
    • Version 1 (16/03/2020)
    • Available by Download   (573 KB)
  • 2001628_COVID-19 Self assessment for risk_A3_V14   
    • Version 1 (20/03/2020)
    • Available by Download   (65 KB)
  • 3136039-LET-Melton Winter Storage Digital Data Disclaimer   
    • Version 1 (23/03/2020)
    • Available by Download   (1 MB)
  • 3136039-MEM-Melton Winter Storage Civil 3D Model Summary   
    • Version 1 (23/03/2020)
    • Available by Download   (436 KB)
  • CL_C3D_MELTON   
    • Version 1 (23/03/2020)
    • Available by Download   (29 MB)
  • HDPE_C3D_MELTON   
    • Version 1 (23/03/2020)
    • Available by Download   (22 MB)
  • CN000095 RFT Part D1 Pricing Schedule Rev 2   
    • Version 1 (24/03/2020)
    • Available by Download   (34 KB)
  • Addendum No 2 MRWP Storage and PIpework - Site Inspection 20200326 - FINAL   
    • Version 1 (27/03/2020)
    • Available by Download   (456 KB)
  • CN000095 Addendum No 1 20200324A   
    • Version 1 (07/04/2020)
    • Available by Download   (109 KB)
  • CN000095 Addendum No 2 20200327A   
    • Version 1 (07/04/2020)
    • Available by Download   (108 KB)
  • CN000095 Addendum No 3 20200407   
    • Version 1 (07/04/2020)
    • Available by Download   (123 KB)
  • CN000095 Link to Drone Footage 20200407   
    • Version 1 (07/04/2020)
    • Available by Download   (103 KB)
  • CN000095 Addendum No 4 20200409   
    • Version 1 (09/04/2020)
    • Available by Download   (145 KB)

Forum 

Forum posts cannot be posted after 14 April 2020 02:00 PM

The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 14 April 2020 02:00 PM.

  Link To Forum

Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.

Results 

This Tender was awarded. Click here to view the Contract.