JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

Buying For Victoria
Skip to main content

Display Tender T110061 

This page displays the details of a tender.

VPCM Docking Aid System
Issued By Victorian Ports Corporation Melbourne
Request for Tender
Status:
Closed
Number:
T110061
UNSPSC
Information Technology Broadcasting and Telecommunications - (50%)
Building and Facility Construction and Maintenance Services - (50%)

Enquiries 

Contacts

Description 

Victoria Ports Corporation Melbourne (VPCM) is responsible for:

  • Channel management and safe navigation in Melbourne’s port waters
  • Waterside emergency and marine pollution response
  • The management of Station Pier as Victoria’s premier cruise shipping and interstate passenger ferry facility

VPCM is seeking Tenders from experienced maritime equipment manufacturers and suppliers, for the design, supply and installation and support of a new docking aid system for use at Station Pier, Port Melbourne.

Summarised requirements of the Docking Aid are for 24/7 operation, cloud processing with simultaneous users, via web browser & dataset downloading.

The works will be expected to be undertaken between January and June 2020.

 

VPCM is extending the Closing Time for Submission of this Tender to Friday 20th December at 14:00. As per RFT Part B - Section 2.12

Specification Documents 

You must be logged in to download documents.
  • VPCM Docking Aid System - Part A - Summary   
    • Version 1 (28/11/2019)
    • Available by Download   (80 KB)
  • VPCM Docking Aid System - Part B - Condition of Tendering   
    • Version 1 (28/11/2019)
    • Available by Download   (91 KB)
  • VPCM Docking Aid System - Part C - Specification and Requirements   
    • Version 1 (28/11/2019)
    • Available by Download   (293 KB)
  • VPCM Docking Aid System - Part D - Condition of Contract   
    • Version 1 (28/11/2019)
    • Available by Download   (782 KB)
  • VPCM Docking Aid System - Part E - Tender Response Schedule   
    • Version 1 (28/11/2019)
    • Available by Download   (111 KB)
  • VPCM Docking Aid System - Part F - Pricing Response Schedule   
    • Version 1 (28/11/2019)
    • Available by Download   (86 KB)
  • VPCM RFT - Part C - Attachment 1 - VPCM Occupational Health and Safety Policy   
    • Version 1 (28/11/2019)
    • Available by Download   (73 KB)
  • VPCM RFT - Part C - Attachment 2 - VPCM Safety and Environment Management Plan   
    • Version 1 (28/11/2019)
    • Available by Download   (3 MB)
  • VPCM RFT - Part C - Attachment 5 - VPCM Hot Work Procedural Gidelines   
    • Version 1 (28/11/2019)
    • Available by Download   (681 KB)
  • VPCM RFT - Part C - Attachment 6 - VPCM Dwg Pack Rev1.0   
    • Version 1 (28/11/2019)
    • Available by Download   (1 MB)
  • VPCM Docking Aid System - FORUM - SP OT Concourse   
    • Version 1 (17/12/2019)
    • Available by Download   (1 MB)
  • VPCM Docking Aid System - FORUM - Addendum 1   
    • Version 1 (17/12/2019)
    • Available by Download   (125 KB)
  • VPCM Docking Aid Tender - Addendum 2   
    • Version 1 (17/12/2019)
    • Available by Download   (95 KB)

Forum 

Forum posts cannot be posted after 13 December 2019 05:00 PM

The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 13 December 2019 05:00 PM.

  Link To Forum

Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.