JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

Buying For Victoria

Display Tender D5168/5169 

This page displays the details of a tender. All tender questions should be directed to the nominated contact person listed for the tender.

Botania Estate 425m of DN450 Branch Sewer
Issued By Western Water
Request for Tender
Status:
Open
Number:
D5168/5169
UNSPSC:
Water and sewer utilities

Enquiries 

Contacts

Description 

Works involve the construction of 425m of DN450 GRP branch sewer as part of the Botania Estate Stages 1A and 2A in Plumpton within Melton City Council Authority.  

Addendum 1 issued on 28/11/2019: 

- Updated Stage 1A and 2A schedules attached. Drawings with notations are also included for stages 1A and 2A.

Specification Documents 

You must be logged in to download documents.
  • Botania Branch Sewer1A Tender Doc AS4000 v5.1  
    • Version 1 (18/11/2019)
    • Available by Download
  • 1700987Botania Branch Sewer Stage 2A Tender Doc AS4000  
    • Version 1 (18/11/2019)
    • Available by Download
  • 20191015-1700987-01A-SEWER-REVB  
    • Version 1 (18/11/2019)
    • Available by Download
  • 20191015-1700987-02A-SEWER-REVB  
    • Version 1 (18/11/2019)
    • Available by Download
  • MEL2018_0151AB Rev1  
    • Version 1 (18/11/2019)
    • Available by Download
  • Addendum 1 (Schedule Stage 2A)  
    • Version 1 (28/11/2019)
    • Available by Download
  • Addendum 1 (notes added to drawing)  
    • Version 1 (28/11/2019)
    • Available by Download
  • Addendum 1 (Schedule Stage 1A)  
    • Version 1 (28/11/2019)
    • Available by Download

Responses 

You must be logged in to submit a response.
Tender closes at 11 December 2019 02:00 PM
Click here to submit an electronic response

Forum 

Forum posts cannot be posted after 11 December 2019 02:00 PM

The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 11 December 2019 02:00 PM.

  Link To Forum

Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.