C1304-2020-005 - MC1258 outlet pipeline installation
Southern Rural Water wishes to advise that it intends to invite tenders on about the 3 June 2020 from suitably qualified contractors to undertake the MC1258 outlet pipeline installation works. The project entails decommissioning approximately 390 meters of earthen irrigation channel and installing 358 meters of 375mm PVC in open trench and 24 meters of 450 HDPE in a 630 HDPE sleeve bored under the Traralgon Maffra Road. A gravel track is to be constructed adjacent to the pipeline to provide access to Southern Rural Water’s Transition Structure. The work site is about two kilometres east of Tinamba, Victoria.
The key dates are as follows:
- Tendering opening 3 June 2020
- Contract award; 17 July 2020
- Pipeline installation complete; 14 August 2020
Further enquiries can be directed to Michael Dowe, Capital Delivery Engineer at [email protected] or on 03 5139 3100 during business hours.
Tender will only be submitted via tenderlink https://www.tenderlink.com/srw/
[email protected] | |
Office: +61 (03) 0427 523 647 |
Supplier Information
1 |
McInnes Earthmoving Pty Ltd
|