Contract - 2021023
Contract Details
The Principal is seeking tenders from suitably qualified and experienced contractors for the provision of supply and construction of the following items for the three Westernport Water pipelines connected to the underside of the San Remo Bridge;
Replacement of the MSCL pipe supports (126 units).
Treatment and preparation of the MSCL pipe surface and wrapping (640m).
Replacement/Refurbishment of the GRP pipe supports (126 Sets).
Refurbishment of protection screens that are located under the GRP pipes for 8 spans of the bridge.
A mandatory site inspection is required. Westernport Water will make two dates available
and the tenderer is only to attend one. The dates are as follows;
22nd June 2022 at 10am
24th June 2022 at 10am
This will be held underneath Span 1 of the bridge (San Remo side). Please inform attendance
via email to Chris Coulthurst as per below.
All submissions must be lodged via Tenderlink www.portal.tenderlink.com/westernportwater/
Civil engineering - (50%)
[email protected] | |
Office: +61 (03) 59564100 |
Supplier Information
1 |
Freyssinet Australia
|